Physical​​ Inventory​​ Procedure

Physical​​ Inventory​​ Procedure

  • 1. Stop​​ entering/editing​​ inventory​​ related​​ transactions​​ in​​ N41

  1. Invoice,​​ Credit​​ Memo,​​ Physical​​ Inventory,​​ PO/Cut​​ Receiving
  • 2. Run​​ Inventory​​ Detail​​ by​​ warehouse​​ report​​ and​​ print

  • Zero​​ out​​ the​​ inventory

  • Count​​ the​​ inventory

  • Enter​​ the​​ count​​ on​​ “Physical​​ Inventory”

  1. Use​​ Tag​​ number​​ will​​ help​​ audit​​ the​​ entry
  • Run​​ “Physical​​ Inventory​​ Variance​​ by​​ Style/Color”​​ and​​ “Physical​​ Inventory​​ Variance​​ by​​ Warehouse”​​ reports

  • Start​​ entering/editing​​ inventory​​ related​​ transactions​​ in​​ N41

  1. Invoice,​​ Credit​​ Memo,​​ Physical​​ Inventory,​​ PO/Cut​​ Receiving

    • Related Articles

    • How to do Physical Inventory Count

      Note; * Take care to follow the following process exactly *Be sure to capture Inventory before Physical count * If you do not enter the count for a style, the style will be zero out * You must “adjust” after Capture and Enter the count at the same ...
    • How to do physical Inventory

      1. Physical Inventory by manual Go to “Style” [1] Click “Physical Inventory” [2] Click “New” [3] Select the “Warehouse” [4] Enter “Tag Number”, “PI Reason” if necessary Click “Add Style” button [5] Select the Style/ Color you want to adjust.[6] There ...
    • How to print UPC Price Ticket

      How to print UPC Price Ticket Steps Go to EDI [1] Click Report [2] Click Print Price Tag [3] Select what type of price tag you want to use Select Form from the menu [1] Select Range [2] Click Refresh [3] Click Print [4]
    • N41 Inventory Abbreviations

      On Hand The current physical stock available in the warehouse. Open Order The total quantity in open sales orders. Need to Allocate The portion of the open order quantity that is awaiting/needing allocation. Allocation, Pick, Shipment Status ...
    • N41 Production Procedure 

      Projection Cut 1. Create Component (Fabric & Trim) 2. Create Fabric PO 3. Create Style Master 4. Create Cost Sheet 5. Receive Fabric PO 6. Create Cut Ticket (Production Order) 7. BOM (Bill of Material) 8. Process (Contractor’s Order) a. Cutting ...